Review of HCMC – Trung Luong highway project

Date: 25-12-2012

+ Highway line: 39.8 km of length, start from Cho Dem intersection on area of Binh Chanh Dist – HCMC to Than Cuu Nghia intersection on area of Chau Thanh Dist – Tien Giang province

+ Junction lines: 22.1 km of length, included: Tan Tao – Cho Dem section is about 9.6 km, Cho Dem – Binh Thuan section is about 3.7 km and junction lines at Trung Luong is about 8.8 km

Technical standard scale of the project:

+ Highway line: A type Highway line, grade 120 along with Vtk=120 km/h based on TCVN 5729-97; cross section with 8 lines and 2 lines for security (8×3.75+2×3.00m), B=41m, in period 1: construction on 4 lines and 2 lines for security (4×3.75+2×3.0), B=25-26m, other lines on cross section used for tree planting.

+ Binh Thuan – Cho Dem, Tan Tao – Cho Dem junction lines: I type road, grade 80 along with Vtk=80km/h based on TCVN 4054-98; cross section with 6 lines and 2 mix lines (6×3.5+2×2.8), B=29m, , in period 1: construction on 4 lines and 2 mix lines (4×3.50+2×2.8), B=22.2m, other lines on cross section used for tree planting

+ Than Cuu Nghia – Trung Luong junction lines: II type road, grade 80 along with Vtk=80km/h based on TCVN 4054-98; cross section with 4 lines and 2mix lines (4×3.5+2×2.5), B=21.6m

+ Distributor road: V type road, grade 40 along with Vtk=40km/h based on TCVN 4054-98; cross section with 2 lines (2×3.0), B=7.0m